Of course sorting the drainage at the bottom of the meadow is a massive job and I have had to take pause to repair equipment, order materials and wait for materials to arrive. It has been amazing to see the amount of water that is and has been trying to flow out of this area! I have now dug a large ditch on either side of the path and several routes through. I have started laying out the piping and making sure that it is all draining the way I want it to before I start to put things back in order.

There is still a lot to do to finish it off and get the walk reopened which must be done in time for the tree planting party that we are planning for the end of March. We have been donated 420 trees by the woodland trust and are putting on a family event to get all of them in the ground quickly!!